Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 12, 2020, 07:11 AM
  • 05 1377_05 1376_08122020_003307.mp4

Date
08/12/2020
W/O
844677
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00487
PipeID
P06596
Time
12:11 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7947
Sewer Name
MONETA TRUNK
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_844677_TV05074_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
05 1376
Downstream MH
05 1377
Dir. of Survey
Upstream
Length Surveyed
293.3 ft.
Total Length
293.3 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
290
O&M Index
2
O&M Quick
2K11
O&M Rating
119
Overall Index
2
Overall Quick
Overall Rating
409
Pipe schematic from manhole 05 1376 to 05 1377
MH: 05 1376MH: 05 1377upstream0 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. MGO - General Observation - CONN @ MH 3 O' CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Ends - 05 13770.3 ft. MGO - General Observation - ROACHES @ MH2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish77 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"125.7 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - 30% GREASE-LATERAL/ACTIVE125.7 ft. RFL - Roots Fine Lateral, at 02 o'clock179.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN197.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN265.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN289.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start291.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start291.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start293.3 ft. MGO - General Observation - ROACHES @ MH293.3 ft. AMH - Downstream Manhole, Survey Begins - 05 1376293.3 ft. MGO - General Observation - CONN @ MH 9 O' CLOCK/UNKNOWN293.3 ft. MWM - Water Mark, 25 %of cross sectional area293.3 ft. MWL - Water Level, 20 %of cross sectional area

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
293.3CM
0MGOROACHES @ MH
0AMH05 1376
95.6TFOPEN
293MGOROACHES @ MH
216.3TFA
0MGOCONN @ MH 9 O' CLOCK/UNKNOWN
293.3MGOCONN @ MH 3 O' CLOCK/ACTIVE
3.4CM
0MWM
293.3AMH05 1377
167.6TFD30% GREASE-LATERAL/ACTIVE
291DAGS
28.2TFOPEN
167.6RFL
2SSS
0MWL
291SSS
113.6TFOPEN
2DAGS

Properties (7)

additional_info
SC411809
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-08-12T00:11:16-07:00
documentation
PROPIPE
is_lateral_inspection
false