Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 12, 2020, 05:48 AM
  • 05 1374_05 1373_08112020_230443.mp4

Date
08/11/2020
W/O
844677
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00487
PipeID
P06593
Time
10:48 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7947
Sewer Name
MONETA TRUNK
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_844677_TV05074_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
05 1373
Downstream MH
05 1374
Dir. of Survey
Upstream
Length Surveyed
330.4 ft.
Total Length
330.4 ft.
Structural Index
3
Structural Quick
3M2L
Structural Rating
334
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
334
Pipe schematic from manhole 05 1373 to 05 1374
MH: 05 1373MH: 05 1374upstream0 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 05 13742.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish48.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"68 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish80.3 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start97.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"109.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"202.7 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"225.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"264.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"267.8 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"315.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"327.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start328.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start330.4 ft. MWM - Water Mark, 30 %of cross sectional area330.4 ft. AMH - Downstream Manhole, Survey Begins - 05 1373330.4 ft. MWL - Water Level, 25 %of cross sectional area330.4 ft. MGO - General Observation - ROACHES @ MH

Observation photos (4)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    62.6 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    127.7 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    250.1 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
14.7TFC
104.7TFC
262.4FL
233.2TFC
0MWM
0AMH05 1373
328SSS
62.6TBA
330.4CM
220.5TF
330.4AMH05 1374
0MWL
65.6TF
127.7TB
0MGOROACHES @ MH
2SSS
250.1FL
2.8CM
282.3TF

Properties (7)

additional_info
SC411809
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-08-11T22:48:04-07:00
documentation
PROPIPE
is_lateral_inspection
false