Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 12, 2020, 08:32 AM
  • 05 1372_05 1371_08122020_014612.mp4

Date
08/12/2020
W/O
844677
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00487
PipeID
P06591
Time
1:32 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7947
Sewer Name
MONETA TRUNK
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_844677_TV05074_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
05 1372
Downstream MH
05 1371
Dir. of Survey
Downstream
Length Surveyed
335.2 ft.
Total Length
335.2 ft.
Structural Index
3
Structural Quick
5141
Structural Rating
357
O&M Index
2
O&M Quick
2L00
O&M Rating
134
Overall Index
2
Overall Quick
Overall Rating
491
Pipe schematic from manhole 05 1372 to 05 1371
MH: 05 1372MH: 05 1371downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 13722 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - ROACHES @ MH3.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start49.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"100.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"149.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"180.6 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"201.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"249.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"250 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start265.7 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES265.7 ft. B - Broken, from 10 to 03 o'clock, within 8 inches of joint: YES295 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish306.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"331 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish333 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish335.2 ft. MGO - General Observation - CONN @ MH 9 O' CLOCK/OPEN335.2 ft. MGO - General Observation - CONN @ MH 3 O' CLOCK/ACTIVE335.2 ft. AMH - Downstream Manhole, Survey Ends - 05 1371335.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"

    180.6 ft. - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    265.7 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (24)

DistanceCodeObservation
3.4CM
0MWL
201.1TFC
331DAGS
265.7FM
2SSS
335.2MGOCONN @ MH 9 O' CLOCK/OPEN
2DAGS
49.6TFA
2MGOROACHES @ MH
333SSS
335.2MGOCONN @ MH 3 O' CLOCK/ACTIVE
180.6TBC
335.2AMH05 1371
149.3TFC
265.7B
295MWLS
100.5TFC
335.2CM
0MWM
0AMH05 1372
250MWLS
306.6TFC
249.5TFC

Properties (7)

additional_info
SC411809
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-08-12T01:32:27-07:00
documentation
PROPIPE
is_lateral_inspection
false