Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 10, 2020, 10:34 AM
  • 05 1393_05 1392_08102020_034809.mp4

Date
08/10/2020
W/O
844699
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00487
PipeID
P06614
Time
3:34 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7944
Sewer Name
MONETA TRUNK
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_844699_TV05336_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
18 in.
Upstream MH
05 1393
Downstream MH
05 1392
Dir. of Survey
Downstream
Length Surveyed
277.7 ft.
Total Length
277.7 ft.
Structural Index
3
Structural Quick
4J2J
Structural Rating
326
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
330
Pipe schematic from manhole 05 1393 to 05 1392
MH: 05 1393MH: 05 1392downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 13932 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.1 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start37.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN81.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"136.7 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start137.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"143 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish187.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"238.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"275 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish275 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish277 ft. MGO - General Observation - ROACHES @ MH277.7 ft. MGO - General Observation - CONN @ MH 3 O' CLOCK/ACTIVE277.7 ft. AMH - Downstream Manhole, Survey Ends - 05 1392277.7 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/CAPPED

Observation photos (2)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    136.7 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
37.4TFOPEN
0MWM
137.4TFA
136.7DAGS
238.9TFC
277MGOROACHES @ MH
277.7MGOCONN @ MH 3 O' CLOCK/ACTIVE
275SSS
0MWL
187.4TFC
81.8TFC
275FM
3.1FM
277.7AMH05 1392
143DAGS
0AMH05 1393
2SSS
277.7MGOCONN @ MH 9 O'CLOCK/CAPPED

Properties (7)

additional_info
SC411806
custom_field_three
MULTIPLE FRACTURE'S
custom_field_two
2
customer
1
datetime
2020-08-10T03:34:28-07:00
documentation
PROPIPE
is_lateral_inspection
false