- Date
- 08/07/2020
- W/O
- 844368
- Weather
- Dry
- Operator/Surveyor
- B.FUGATE
- Sewer ID
- Z00457
- PipeID
- P06089
- Time
- 1:21 AM
- Certificate
- U-508-7069
- System Owner
- 1
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K7942
- Sewer Name
- IMPERIAL HIGHWAY EXTENSION TRUNK
- City
- INGLEWOOD
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 05
- Page No.
- 09
- Purpose
- Routine Assessment
- Project
- RFIR_WO_844368_TV05334_AUG2020
- Sewer Type
- Gravity
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 10 in.
- Width
- 12 in.
- Upstream MH
- 05 0858
- Downstream MH
- 05 0859
- Dir. of Survey
- Upstream
- Length Surveyed
- 68.4 ft.
- Total Length
- 68.4 ft.
- Structural Index
- 2
- Structural Quick
- 4223
- Structural Rating
- 21
- O&M Index
- 0
- O&M Quick
- 0000
- O&M Rating
- 0
- Overall Index
- 2
- Overall Quick
- —
- Overall Rating
- 21
Pipe schematic from manhole 05 0858 to 05 0859 Observation photos (7)

3.5 ft. - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES

3.5 ft. - Joint Separated Large

7.2 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - NO FLOW OBSERVED

8.2 ft. - Joint Offset Large

28.4 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

31.5 ft. - Material Change, Not known - POSSIBLY CAST IRON

35.4 ft. - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start