Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 14, 2020, 05:51 AM
  • 29 0529A_29 0529_07132020_230343.mp4

Date
07/13/2020
W/O
839468
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01106
PipeID
P24584
Time
10:51 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7914
Sewer Name
19TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_839468_TV29072_JUL2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0529A
Downstream MH
29 0529
Dir. of Survey
Downstream
Length Surveyed
249.2 ft.
Total Length
249.2 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
245
O&M Index
2
O&M Quick
2I00
O&M Rating
98
Overall Index
2
Overall Quick
Overall Rating
343
Pipe schematic from manhole 29 0529A to 29 0529
MH: 29 0529AMH: 29 0529downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - CLEANOUT0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 0529A2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"35.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN48.8 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN56.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"104.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"149.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"203.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN205.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"247 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish247 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish249 ft. MGO - General Observation - ROACHES @ MH249.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish249.2 ft. AMH - Downstream Manhole, Survey Ends - 29 0529

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    2.3 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"

Observations (21)

DistanceCodeObservation
247SSS
247DAGS
249.1CM
2.3TBA
2CM
149.1TFA
2DAGS
0MWL
48.8TBOPEN
205.8TFA
0MGOCLEANOUT
249.2AMH29 0529
0MWM
56.5TFA
2SSS
9TFA
0AMH29 0529A
249MGOROACHES @ MH
35.7TFOPEN
203.5TFOPEN
104.2TFA

Properties (7)

additional_info
SC411773
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-07-13T22:51:44-07:00
documentation
PROPIPE
is_lateral_inspection
false