Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 14, 2020, 08:24 AM
  • 29 0525_29 0524_07142020_013631.mp4

Date
07/14/2020
W/O
839468
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01106
PipeID
P24577
Time
1:24 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7914
Sewer Name
19TH STREET SEWER
City
SIGNAL HILL
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Routine Assessment
Project
RFIR_WO_839468_TV29072_JUL2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0524
Downstream MH
29 0525
Dir. of Survey
Upstream
Length Surveyed
199 ft.
Total Length
199 ft.
Structural Index
2
Structural Quick
3F2G
Structural Rating
190
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
190
Pipe schematic from manhole 29 0524 to 29 0525
MH: 29 0524MH: 29 0525upstream0 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 29 05252 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish4.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN4.8 ft. TFB - Tap Factory Made Abandoned, at 12 o'clock, -, within 8 inches of joint: NO, 6"16.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN82.4 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 4", 4" - OPEN109.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN113.8 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6", 6" - OPEN115.1 ft. JOM - Joint Offset Medium185.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start197 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start199 ft. MWL - Water Level, 5 %of cross sectional area199 ft. MWM - Water Mark, 5 %of cross sectional area199 ft. AMH - Downstream Manhole, Survey Begins - 29 0524

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    13.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Joint Offset Medium

    83.9 ft. - Joint Offset Medium

  • Tap Factory Made Abandoned, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    194.2 ft. - Tap Factory Made Abandoned, at 12 o'clock, -, within 8 inches of joint: NO, 6"

Observations (15)

DistanceCodeObservation
2SSS
199CM
194.9TFOPEN
85.2TFOPEN
199AMH29 0525
0MWL
13.5CM
0MWM
182.8TFOPEN
83.9JOM
194.2TFB
116.6TFAOPEN
197SSS
89.3TFOPEN
0AMH29 0524

Properties (7)

additional_info
SC411773
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-07-14T01:24:28-07:00
documentation
PROPIPE
is_lateral_inspection
false