Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 14, 2020, 09:05 AM
  • 29 0523_29 0522_07142020_020442.mp4

Date
07/14/2020
W/O
839468
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01106
PipeID
P24575
Time
2:05 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7914
Sewer Name
19TH STREET SEWER
City
SIGNAL HILL
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Routine Assessment
Project
RFIR_WO_839468_TV29072_JUL2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0523
Downstream MH
29 0522
Dir. of Survey
Downstream
Length Surveyed
259.6 ft.
Total Length
259.6 ft.
Structural Index
3
Structural Quick
413I
Structural Rating
259
O&M Index
2
O&M Quick
2I00
O&M Rating
104
Overall Index
2
Overall Quick
Overall Rating
363
Pipe schematic from manhole 29 0523 to 29 0522
MH: 29 0523MH: 29 0522downstream0 ft. AMH - Upstream Manhole, Survey Begins - 29 05230 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.9 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES73.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"135.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN155.8 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN239.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN253.5 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - 40% GREASE-LATERAL/OPEN257 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish257 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish259.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish259.6 ft. AMH - Downstream Manhole, Survey Ends - 29 0522

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

    3.9 ft. - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    155.8 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

Observations (16)

DistanceCodeObservation
253.5TFD40% GREASE-LATERAL/OPEN
3.9FM
259.5CM
155.8TBOPEN
259.6AMH29 0522
239.2TFOPEN
0AMH29 0523
2DAGS
2CM
257SSS
135.7TFOPEN
0MWM
0MWL
2SSS
73.9TFA
257DAGS

Properties (7)

additional_info
SC411773
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-07-14T02:05:39-07:00
documentation
PROPIPE
is_lateral_inspection
false