Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 14, 2020, 03:55 AM
  • 29 0519A_29 0519_07132020_212538.mp4

Date
07/13/2020
W/O
839468
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01106
PipeID
P24571
Time
8:55 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7914
Sewer Name
19TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_839468_TV29072_JUL2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0519
Downstream MH
29 0519A
Dir. of Survey
Upstream
Length Surveyed
291.9 ft.
Total Length
291.9 ft.
Structural Index
3
Structural Quick
413K
Structural Rating
300
O&M Index
2
O&M Quick
312K
O&M Rating
119
Overall Index
2
Overall Quick
Overall Rating
419
Pipe schematic from manhole 29 0519 to 29 0519A
MH: 29 0519MH: 29 0519Aupstream0 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES0 ft. ACOM - Cleanout Mainline, Survey Ends - 29 0519A2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2 ft. FL - Fracture Longitudinal, at 09 o'clock, within 8 inches of joint: YES2.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN2.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish4.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN24.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"40.1 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - SLEEVE/REPAIR @ CONN/OPEN47.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"98.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"110.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN149.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN151.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN205 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN211.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"250.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"251.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN257 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES271.6 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES273.8 ft. TBD - Tap Break-In Defective, at 10 o'clock, -, , within 8 inches of joint: YES, 4", 6" - 25% GREASE-LATERAL/OPEN285.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"289.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start289.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start289.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start291.9 ft. MWM - Water Mark, 10 %of cross sectional area291.9 ft. MWL - Water Level, 5 %of cross sectional area291.9 ft. AMH - Downstream Manhole, Survey Begins - 29 0519291.9 ft. MGO - General Observation - ROACHES @ MH

Observation photos (6)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Defective, at 10 o'clock, -,  , within 8 inches of joint: YES, 4", 6" - 25% GREASE-LATERAL/OPEN

    18.1 ft. - Tap Break-In Defective, at 10 o'clock, -, , within 8 inches of joint: YES, 4", 6" - 25% GREASE-LATERAL/OPEN

  • Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

    20.3 ft. - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    34.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    289.9 ft. - Fracture Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

    291.9 ft. - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

Observations (30)

DistanceCodeObservation
291.9FM
289SSS
289.9CM
2SSS
2CM
41.8TFC
0MWM
20.3CL
2DAGS
289.9FL
0MWL
86.9TFOPEN
244.6TFC
251.8TFDSLEEVE/REPAIR @ CONN/OPEN
0AMH29 0519
6.2TFC
289DAGS
267.2TFC
34.9CM
80.3TFA
40.1TFOPEN
140.2TFOPEN
287.7TFOPEN
18.1TBD25% GREASE-LATERAL/OPEN
289.7TFOPEN
291.9ACOM29 0519A
142.8TFOPEN
181.2TFOPEN
193.6TFC
0MGOROACHES @ MH

Properties (7)

additional_info
SC411773
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-07-13T20:55:07-07:00
documentation
PROPIPE
is_lateral_inspection
false