C 0097_C 0096_992020_014022.mp4
2 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - General Observation - MAG COAT 85% START 10:00 TO 2:00 START
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - General Observation - CONCRETE BEAM START AT 12:00 SEVERE AGG MISSING
61.6 ft. - Surface Aggregate Missing, at 12 o'clock, within 8 inches of joint: NO - CONCRETE BEAM FALLING APART
66.6 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
99.4 ft. - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
129 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG
146.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start
890.8 ft. - General Observation - DEBRIE ON BOTTOM OF PIPE STOPPED CABLE PULL UNTIL REMOVED FROM CABLE
989.2 ft. - General Observation - DEBRIE ON CABLE
| Distance | Code | Observation |
|---|---|---|
| 2 | SAM | SEVERE AGG |
| 2 | MGO | MAG COAT 85% START 10:00 TO 2:00 START |
| 258.2 | IR | — |
| 146.4 | DAGS | — |
| 61.6 | SAM | CONCRETE BEAM FALLING APART |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 989.8 | AMH | 4:25AM |
| 0 | MWL | — |
| 989.2 | DAGS | — |
| 0 | AMH | 2:15AM |
| 0 | MWM | — |
| 249.8 | ID | — |
| 989.2 | MGO | DEBRIE ON CABLE |
| 2 | MGO | CONCRETE BEAM START AT 12:00 SEVERE AGG MISSING |
| 129 | SAM | SEVERE AGG |
| 989.2 | SAM | SEVERE AGG |
| 99.4 | SRV | CIRCUM REBAR |
| 989.2 | SSS | BLISTERING PEELING CONCRETE |
| 890.8 | MGO | DEBRIE ON BOTTOM OF PIPE STOPPED CABLE PULL UNTIL REMOVED FROM CABLE |
| 66.6 | SAM | SEVERE AGG |