C 0099_C 0098_922020_011933.mp4
2 ft. - General Observation - RAISED CONCRETE SECTION AT 12:00 BREAKING APART START
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - General Observation - MAG COAT 95% START 10:00 TO 2:00
12.9 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
133.6 ft. - Surface Aggregate Missing, at 12 o'clock, within 8 inches of joint: NO - CONCRETE CENTER !12:00 BEAM
216.8 ft. - Surface Aggregate Missing, from 10 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG
359.8 ft. - Surface Aggregate Missing, from 12 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
513.6 ft. - General Observation - 98% MAG COAT START
722.5 ft. - Surface Aggregate Missing, from 12 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
830.2 ft. - General Observation - DEBRIE ON CABLE
| Distance | Code | Observation |
|---|---|---|
| 2 | MGO | RAISED CONCRETE SECTION AT 12:00 BREAKING APART START |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 216.8 | SAM | SEVERE AGG |
| 133.6 | SAM | CONCRETE CENTER !12:00 BEAM |
| 830.7 | AMH | 2:15AM |
| 0 | MWL | — |
| 12.9 | SAM | SEVERE AGG |
| 2 | SAM | SEVERE AGG |
| 830.2 | SSS | BLISTERING PEELING CONCRETE |
| 513.6 | MGO | 98% MAG COAT START |
| 830.2 | MGO | 98% MAG COAR FINISH |
| 830.2 | MGO | DEBRIE ON CABLE |
| 0 | MWM | — |
| 722.5 | SAM | SEVERE AGG |
| 0 | AMH | 1:25AM |
| 830.2 | SAM | SEVERE AGG |
| 359.8 | SAM | SEVERE AGG |
| 2 | MGO | MAG COAT 95% START 10:00 TO 2:00 |