Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 13, 2020, 10:05 AM
  • 08 0228_08 0227 _07132020_031119.mp4

Date
07/13/2020
W/O
839004
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00005
PipeID
P00102
Time
3:05 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7912
Sewer Name
EAST ROAD TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_839004_TV08112_JUL2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
12 in.
Upstream MH
08 0228
Downstream MH
08 0227
Dir. of Survey
Downstream
Length Surveyed
90.8 ft.
Total Length
90.8 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 08 0228 to 08 0227
MH: 08 0228MH: 08 0227downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK CAPPED0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 022813.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start36.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"90.8 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK90.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish90.8 ft. AMH - Downstream Manhole, Survey Ends - 08 0227

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    13.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
90.8MGOCONNECTION AT MH 3 O'CLOCK
90.8CM
0MWM
13.1CM
0MGOCONNECTION AT MH 9 O'CLOCK CAPPED
36.5TF
0MWL
90.8AMH08 0227
0AMH08 0228

Properties (7)

additional_info
SC411771
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-07-13T03:05:17-07:00
documentation
PROPIPE
is_lateral_inspection
false