Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 9, 2020, 07:28 AM
  • 08 0611_08 0610_07092020_003133.mp4

Date
07/09/2020
W/O
839310
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00011
PipeID
P00649
Time
12:28 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7907
Sewer Name
JAMES STREET RELIEF TRUNK
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
07
Purpose
Routine Assessment
Project
WO_839310_TV08147_JUL2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
8 in.
Upstream MH
08 0610
Downstream MH
08 0611
Dir. of Survey
Upstream
Length Surveyed
47.2 ft.
Total Length
47.2 ft.
Structural Index
2
Structural Quick
2900
Structural Rating
18
O&M Index
2
O&M Quick
2900
O&M Rating
18
Overall Index
2
Overall Quick
Overall Rating
36
Pipe schematic from manhole 08 0610 to 08 0611
MH: 08 0610MH: 08 0611upstream0 ft. AMH - Upstream Manhole, Survey Ends - 08 06112.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish45.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start45.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start47.2 ft. AMH - Downstream Manhole, Survey Begins - 08 061047.2 ft. MWM - Water Mark, 15 %of cross sectional area47.2 ft. MWL - Water Level, 10 %of cross sectional area

Observations (8)

DistanceCodeObservation
2SSS
0AMH08 0610
2DAGS
45SSS
47.2AMH08 0611
45DAGS
0MWM
0MWL

Properties (7)

additional_info
SC411765
custom_field_two
3
customer
1
datetime
2020-07-09T00:28:43-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
30711