Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 12, 2020, 09:58 AM
  • 05 1975_J 0182 _08122020_031921.mp4

Date
08/12/2020
W/O
844688
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00545
PipeID
P07175
Time
2:58 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7949
Sewer Name
9TH STREET CONNECTION TRUNK
City
SAN PEDRO
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
47A
Purpose
Routine Assessment
Project
RFIR_WO_844688_TV05318_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
21 in.
Upstream MH
05 1975
Downstream MH
J 0182
Dir. of Survey
Downstream
Length Surveyed
49.8 ft.
Total Length
49.8 ft.
Structural Index
3
Structural Quick
3721
Structural Rating
23
O&M Index
2
O&M Quick
2400
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
31
Pipe schematic from manhole 05 1975 to J 0182
MH: 05 1975MH: J 0182downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 197515.7 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start27.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start39.7 ft. MWLS - Water Level, Sag in pipe, 25 %of cross sectional area49.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish49.8 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish49.8 ft. AMH - Downstream Manhole, Survey Ends - J 0182

Observation photos (2)

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    15.7 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    27.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
0MWL
49.8DAGS
49.8CM
0MWM
0AMH05 1975
27.9DAGS
39.7MWLS
49.8AMHJ 0182
15.7CM

Properties (7)

additional_info
SC411811
custom_field_three
CRACKS/SAG/GREASE
custom_field_two
3
customer
1
datetime
2020-08-12T02:58:58-07:00
documentation
PROPIPE
is_lateral_inspection
false