Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 15, 2020, 09:01 AM
  • 03 0141_03 0140_07152020_014041.mp4

Date
07/15/2020
W/O
838910
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00363
PipeID
P04758
Time
2:01 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7919
Sewer Name
LAKEWOOD TRUNK
City
LAKEWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_838910_TV03169_JUL2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
24 in.
Upstream MH
03 0141
Downstream MH
03 0140
Dir. of Survey
Downstream
Length Surveyed
346.7 ft.
Total Length
346.7 ft.
Structural Index
3
Structural Quick
3L12
Structural Rating
197
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
197
Pipe schematic from manhole 03 0141 to 03 0140
MH: 03 0141MH: 03 0140downstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 03 01412 ft. MGO - General Observation - ROUGH / "SPOTTY" SURFACE THROUGHOUT LINE - 8 TO 4 O'CLOCK - VCP3.2 ft. CC - Crack Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES5 ft. CC - Crack Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES20.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start346 ft. MGO - General Observation - RAGS PRESENT - @ ACTIVE 3 O'CLK. CONN. - D/S MH346.7 ft. AMH - Downstream Manhole, Survey Ends - 03 0140346.7 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK346.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Crack Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES

    3.2 ft. - Crack Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES

    5 ft. - Crack Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    20.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
346.7AMH03 0140
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
5CC
2MGOROUGH / "SPOTTY" SURFACE THROUGHOUT LINE - 8 TO 4 O'CLOCK - VCP
0MWL
346.7MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0MWM
3.2CC
346MGORAGS PRESENT - @ ACTIVE 3 O'CLK. CONN. - D/S MH
0AMH03 0141
20.8CM
346.7CM

Properties (7)

additional_info
SC411778
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-07-15T02:01:08-07:00
documentation
PROPIPE
is_lateral_inspection
false