Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 9, 2020, 04:52 AM
  • 01 0028_01 0027_07082020_221825.mp4

Date
07/08/2020
W/O
839352
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00209
PipeID
P00776
Time
9:52 PM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7823
Sewer Name
HOOPER AVENUE-COMPTON CREEK TRUNK
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
WO_839352_TV01042_JUL2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
27 in.
Width
12 in.
Upstream MH
01 0028
Downstream MH
01 0027
Dir. of Survey
Downstream
Length Surveyed
277.4 ft.
Total Length
277.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 01 0028 to 01 0027
MH: 01 0028MH: 01 0027downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 00280 ft. MWL - Water Level, 30 %of cross sectional area5.4 ft. MGO - General Observation - LINED PIPE59.5 ft. MGO - General Observation - HIGH WATER MARK OBSERVED - 85% OF CROSS-SECTION - CONTINUES THROUGH LINE89 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 4"102.3 ft. MWL - Water Level, 55 %of cross sectional area277.4 ft. AMH - Downstream Manhole, Survey Ends - 01 0027277.4 ft. MGO - General Observation - CONNECTION AT MH, 3 AND 9 O'CLOCK - BOTH ACTIVE

Observations (9)

DistanceCodeObservation
277.4AMH01 0027
59.5MGOHIGH WATER MARK OBSERVED - 85% OF CROSS-SECTION - CONTINUES THROUGH LINE
89TB
277.4MGOCONNECTION AT MH, 3 AND 9 O'CLOCK - BOTH ACTIVE
0MWM
5.4MGOLINED PIPE
102.3MWL
0AMH01 0028
0MWL

Properties (8)

additional_info
SC411633
custom_field_three
LINED PIPE, NO STRUCTURAL DEFECTS
custom_field_two
4
customer
1
datetime
2020-07-08T21:52:22-07:00
documentation
PROPIPE
is_lateral_inspection
false
lining
CIPP