C 0101_C 0100_8312020_014754.mp4
2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
2 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO, Start - CIRCUM REBAR
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
14.2 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM
28.5 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
40.4 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Capped
82.8 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
139.6 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
153.4 ft. - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: NO - CIRCUM
156.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
168.4 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: NO - CIRCUM
204.8 ft. - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: NO - CIRCUM
| Distance | Code | Observation |
|---|---|---|
| 2 | SAM | SEVERE AGG SPORATIC |
| 82.8 | SAM | SEVERE AGG |
| 28.5 | SAM | SEVERE AGG |
| 14.2 | SRV | CIRCUM |
| 156.9 | DAGS | — |
| 2 | SRV | CIRCUM REBAR |
| 453.1 | DAGS | — |
| 204.8 | SRV | CIRCUM |
| 453.1 | SSS | BLISTERING PEELING CONCRETE |
| 28.5 | SRV | CIRCUM |
| 139.6 | SRV | CIRCUM REBAR |
| 168.4 | SRV | CIRCUM |
| 0 | AMH | 1:45AM |
| 40.4 | TFC | Capped |
| 0 | MWM | — |
| 453.1 | SAM | SEVERE AGG SPORATIC |
| 0 | MWL | — |
| 294 | SRV | CIRCUM |
| 453.8 | AMH | 2:20AM |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 153.4 | SRV | CIRCUM |