Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 29, 2020, 07:03 AM
  • C 0499_LONG BEACH_8292020_011815.mp4

Date
08/29/2020
W/O
0828778
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00119
PipeID
P20573
Time
12:03 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1551
Sewer Name
C JOINT OUTFALL C - UNIT 2
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
18
Purpose
Routine Assessment
Project
20200829MDM_JOINT_OUTFALL_C_UNIT_2
Material
Reinforced Concrete Pipe
Shape
Circular
Height
72 in.
Upstream MH
C 0499
Downstream MH
LONG BEACH
Dir. of Survey
Downstream
Length Surveyed
8.5 ft.
Total Length
8.5 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
4
O&M Quick
5121
O&M Rating
7
Overall Index
3
Overall Quick
Overall Rating
12
Pipe schematic from manhole C 0499 to LONG BEACH
MH: C 0499MH: LONG BEACHdownstream0 ft. MWL - Water Level, 80 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12:45AM0 ft. MWM - Water Mark, 80 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - BLISTERING PEELING CONCRETE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 01 to 02 o'clock, , within 8 inches of joint: NO8 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO, Finish - BLISTERING PEELING CONCRETE8 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG8.5 ft. AMH - Downstream Manhole, Survey Ends - 2:05AM

Observation photos (4)

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - BLISTERING PEELING CONCRETE

  • Deposits Attached Grease, 5 %of cross sectional area, from 01 to 02 o'clock,  , within 8 inches of joint: NO

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 01 to 02 o'clock, , within 8 inches of joint: NO

  • Downstream Manhole, Survey Ends - 2:05AM

    8.5 ft. - Downstream Manhole, Survey Ends - 2:05AM

Observations (9)

DistanceCodeObservation
2SAVSEVERE AGG
0MWL
2SSSBLISTERING PEELING CONCRETE
2DAGS
0AMH12:45AM
8SSSBLISTERING PEELING CONCRETE
0MWM
8.5AMH2:05AM
8SAVSEVERE AGG

Properties (6)

custom_field_three
SEVERE AGG VISIBLE SPORATIC
custom_field_two
4
customer
LACSD
datetime
2020-08-29T00:03:33-07:00
documentation
MARTIN,OLIVER 111,BARR,CASTILLO
is_lateral_inspection
false