Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 10, 2020, 07:22 AM
  • G 0331_G 0330_07102020_004927.mp4

Date
07/10/2020
W/O
838752
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z01247
PipeID
P01767
Time
12:22 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7827
Sewer Name
G JOINT OUTFALL G - UNIT 9 TRUNK
City
SOUTH GATE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_838752_TV01202_JUL2020
Sewer Type
Gravity
Material
RCP-CTL
Shape
Circular
Height
30 in.
Width
36 in.
Upstream MH
G 0330
Downstream MH
G 0331
Dir. of Survey
Upstream
Length Surveyed
291.9 ft.
Total Length
291.9 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2K00
O&M Rating
116
Overall Index
2
Overall Quick
Overall Rating
116
Pipe schematic from manhole G 0330 to G 0331
MH: G 0330MH: G 0331upstream0 ft. AMH - Upstream Manhole, Survey Ends - G 03311.2 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish289.8 ft. MGO - General Observation - MAG COATING ATTATCHED289.8 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start291.9 ft. AMH - Downstream Manhole, Survey Begins - G 0330291.9 ft. MWM - Water Mark, 15 %of cross sectional area291.9 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (1)

  • Deposits Settled Compacted,  5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Settled Compacted, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
2.1MGOMAG COATING ATTATCHED
0AMHG 0330
0MWM
290.7DSC
0MWL
2.1DSC
291.9AMHG 0331

Properties (8)

additional_info
SC411637
custom_field_three
MAG COATING COVERING MAJORITY OF PIPE
custom_field_two
3
customer
1
datetime
2020-07-10T00:22:33-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
10286