Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 10, 2020, 07:04 AM
  • G 0330_G 0329_07102020_002117.mp4

Date
07/10/2020
W/O
838752
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z01247
PipeID
P01766
Time
12:04 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7827
Sewer Name
G JOINT OUTFALL G - UNIT 9 TRUNK
City
SOUTH GATE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_838752_TV01202_JUL2020
Sewer Type
Gravity
Material
RCP-CTL
Shape
Circular
Height
30 in.
Width
39 in.
Upstream MH
G 0329
Downstream MH
G 0330
Dir. of Survey
Upstream
Length Surveyed
288.7 ft.
Total Length
288.7 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
2a00
O&M Rating
338
Overall Index
2
Overall Quick
Overall Rating
343
Pipe schematic from manhole G 0329 to G 0330
MH: G 0329MH: G 0330upstream0 ft. AMH - Upstream Manhole, Survey Ends - G 03300.6 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish0.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0.6 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish92.6 ft. SSS - Surface Spalling, from 08 to 10 o'clock, within 8 inches of joint: YES231.8 ft. CM - Crack Multiple, from 02 to 03 o'clock, within 8 inches of joint: YES273.3 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start286.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start286.2 ft. MGO - General Observation - MAG COATING ATTATCHED286.2 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start288.7 ft. MWM - Water Mark, 15 %of cross sectional area288.7 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK288.7 ft. MWL - Water Level, 10 %of cross sectional area288.7 ft. AMH - Downstream Manhole, Survey Begins - G 0329

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Compacted,  10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.5 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    15.4 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 02 to 03 o'clock, within 8 inches of joint: YES

    56.9 ft. - Crack Multiple, from 02 to 03 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 08 to 10 o'clock, within 8 inches of joint: YES

    196.1 ft. - Surface Spalling, from 08 to 10 o'clock, within 8 inches of joint: YES

Observations (14)

DistanceCodeObservation
288.1DAE
0MWM
2.5DAGS
0MGOCONNECTION AT MH, 9 O'CLOCK
196.1SSS
2.5MGOMAG COATING ATTATCHED
288.1DAGS
0MWL
0AMHG 0329
288.7AMHG 0330
2.5DSC
288.1DSC
15.4DAE
56.9CM

Properties (8)

additional_info
SC411637
custom_field_three
CRACKS, SPALLING
custom_field_two
3
customer
1
datetime
2020-07-10T00:04:59-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
10286