G 0330_G 0329_07102020_002117.mp4
2.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2.5 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
15.4 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start
56.9 ft. - Crack Multiple, from 02 to 03 o'clock, within 8 inches of joint: YES
196.1 ft. - Surface Spalling, from 08 to 10 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 288.1 | DAE | — |
| 0 | MWM | — |
| 2.5 | DAGS | — |
| 0 | MGO | CONNECTION AT MH, 9 O'CLOCK |
| 196.1 | SSS | — |
| 2.5 | MGO | MAG COATING ATTATCHED |
| 288.1 | DAGS | — |
| 0 | MWL | — |
| 0 | AMH | G 0329 |
| 288.7 | AMH | G 0330 |
| 2.5 | DSC | — |
| 288.1 | DSC | — |
| 15.4 | DAE | — |
| 56.9 | CM | — |