G 0326_G 0325_07102020_024002.mp4
4.6 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
49.2 ft. - Crack Circumferential, from 09 to 10 o'clock, within 8 inches of joint: NO
84.9 ft. - Surface Other, from 09 to 03 o'clock, within 8 inches of joint: YES - MISSING TILES
84.9 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES
97.9 ft. - Surface Other, from 09 to 12 o'clock, within 8 inches of joint: YES - TILES BROKEN
97.9 ft. - Surface Aggregate Visible, from 09 to 12 o'clock, within 8 inches of joint: YES
104.5 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MISSING TILES
| Distance | Code | Observation |
|---|---|---|
| 84.9 | SZ | MISSING TILES |
| 104.5 | SZ | MISSING TILES |
| 84.9 | SAP | — |
| 4.6 | DSC | — |
| 0 | MGO | CONNECTION AT MH, 3 AND 9 O'CLOCK |
| 0 | MWL | — |
| 4.6 | MGO | MAG COATING ATTATCHED |
| 0 | MWM | — |
| 221.7 | DSC | — |
| 0 | AMH | G 0326 |
| 221.7 | MSA | HEAVY SLUDGE |
| 221.7 | SZ | MISSING TILES |
| 49.2 | CC | — |
| 140.3 | DSZ | SLUDGE |
| 97.9 | SZ | TILES BROKEN |
| 221.7 | DSZ | SLUDGE |
| 97.9 | SAV | — |