Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 23, 2020, 06:31 AM
  • 14 0402_14 0401A_06222020_234317.mp4

Date
06/22/2020
W/O
833715
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18485
Time
11:31 PM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7858
Sewer Name
TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_833715_TV14025_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0402
Downstream MH
14 0401A
Dir. of Survey
Downstream
Length Surveyed
324.1 ft.
Total Length
324.1 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
315
O&M Index
2
O&M Quick
2Y00
O&M Rating
258
Overall Index
2
Overall Quick
Overall Rating
573
Pipe schematic from manhole 14 0402 to 14 0401A
MH: 14 0402MH: 14 0401Adownstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 04020 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE2 ft. MGO - General Observation - 70% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start7.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start7.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start23 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"43.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"87.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"92.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"120 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - UNKNOWN129.5 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 4"129.5 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES144.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"169 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"197.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"222.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"246.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"274.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"295.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"322 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish322.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish322.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish322.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish324.1 ft. AMH - Downstream Manhole, Survey Ends - 14 0401A

Observation photos (4)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    7.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (29)

DistanceCodeObservation
2MGO70% MAG COAT
222.1TFC
129.5TBA
7.2SSS
295.1TFC
129.5DAGS
43.2TFC
87.8TFC
2DAGS
0MWM
197.9TFC
274.8TFC
92.1TFC
144.6TFC
0AMH14 0402
0MGOROACHES @ MH
324.1AMH14 0401A
0MWL
322.3DAGS
322.3SSS
23TFC
120TFUNKNOWN
322DAR
246.4TFC
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
322.3SAP
169TFC
2DAR
7.2SAP

Properties (7)

additional_info
SC411299
custom_field_three
AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2020-06-22T23:31:23-07:00
documentation
PRO PIPE
is_lateral_inspection
false