Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 23, 2020, 06:49 AM
  • 14 0401_14 0400_06222020_235547.mp4

Date
06/22/2020
W/O
833715
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18483
Time
11:49 PM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7858
Sewer Name
TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_833715_TV14025_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0401
Downstream MH
14 0400
Dir. of Survey
Downstream
Length Surveyed
105 ft.
Total Length
105 ft.
Structural Index
3
Structural Quick
3C2C
Structural Rating
100
O&M Index
2
O&M Quick
412G
O&M Rating
84
Overall Index
2
Overall Quick
Overall Rating
184
Pipe schematic from manhole 14 0401 to 14 0400
MH: 14 0401MH: 14 0400downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/OPEN0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 04012 ft. MGO - General Observation - 40% MAG COAT2 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start16.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"25.2 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"40.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"65.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"89.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"102 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish102.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish102.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish102.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish105 ft. AMH - Downstream Manhole, Survey Ends - 14 0400105 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/105 ft. MGO - General Observation - ROACHES @ MH

Observation photos (4)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    105 ft. - General Observation - ROACHES @ MH

Observations (22)

DistanceCodeObservation
105AMH14 0400
0MWL
0MGOROACHES @ MH
25.2TBA
102.4SSS
2MGO40% MAG COAT
0MGOCONN @ MH 3 O'CLOCK/OPEN
0MWM
105MGOCONN @ MH 9 O'CLOCK/
40.9TFC
2DAR
89.7TFC
0AMH14 0401
102DAR
105MGOROACHES @ MH
102.4DAGS
16.6TFC
65.3TFC
102.4SAP
2SSS
2DAGS
2SAP

Properties (7)

additional_info
SC411299
custom_field_three
AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2020-06-22T23:49:23-07:00
documentation
PRO PIPE
is_lateral_inspection
false