Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 23, 2020, 07:50 AM
  • 14 0398_14 0397_06232020_005518.mp4

Date
06/23/2020
W/O
833715
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18480
Time
12:50 AM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7858
Sewer Name
TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_833715_TV14025_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0398
Downstream MH
14 0397
Dir. of Survey
Downstream
Length Surveyed
63.1 ft.
Total Length
63.1 ft.
Structural Index
3
Structural Quick
3A2A
Structural Rating
60
O&M Index
2
O&M Quick
2D00
O&M Rating
48
Overall Index
2
Overall Quick
Overall Rating
108
Pipe schematic from manhole 14 0398 to 14 0397
MH: 14 0398MH: 14 0397downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 03980 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 30% MAG COAT2 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start7.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"30.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"61 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish61.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish61.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish61.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish63.1 ft. AMH - Downstream Manhole, Survey Ends - 14 039763.1 ft. MGO - General Observation - ROACHES @ MH

Observation photos (5)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    63.1 ft. - General Observation - ROACHES @ MH

Observations (18)

DistanceCodeObservation
61.2DAGS
2SAP
30.3TFC
2MGO30% MAG COAT
61.2SAP
7.3TFC
0AMH14 0398
63.1AMH14 0397
2DAR
61DAR
61.2SSS
0MGOROACHES @ MH
2DAGS
0MWL
0MWM
63.1MGOROACHES @ MH
2SSS
0MGOCONN @ MH 3 O'CLOCK/ACTIVE

Properties (7)

additional_info
SC411299
custom_field_three
AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2020-06-23T00:50:53-07:00
documentation
PRO PIPE
is_lateral_inspection
false