Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 23, 2020, 08:06 AM
  • 14 0396A_14 0396_06232020_011110.mp4

Date
06/23/2020
W/O
833715
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18478
Time
1:06 AM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7858
Sewer Name
TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_833715_TV14025_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0396A
Downstream MH
14 0396
Dir. of Survey
Downstream
Length Surveyed
48.8 ft.
Total Length
48.8 ft.
Structural Index
3
Structural Quick
3929
Structural Rating
45
O&M Index
2
O&M Quick
412C
O&M Rating
40
Overall Index
2
Overall Quick
Overall Rating
85
Pipe schematic from manhole 14 0396A to 14 0396
MH: 14 0396AMH: 14 0396downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Begins - 14 0396A0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE2 ft. MGO - General Observation - 30% MAG COAT2 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"27.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"46 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish46.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish46.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish46.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish48.8 ft. MGO - General Observation - ROACHES @ MH48.8 ft. AMH - Downstream Manhole, Survey Ends - 14 0396

Observation photos (5)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    48.8 ft. - General Observation - ROACHES @ MH

Observations (18)

DistanceCodeObservation
2.9TFC
2MGO30% MAG COAT
2DAR
46.8DAGS
2DAGS
48.8MGOROACHES @ MH
0MGOROACHES @ MH
46DAR
0AMH14 0396A
46.8SSS
2SSS
0MWL
2SAP
27.2TFC
0MWM
46.8SAP
48.8AMH14 0396
0MGOCONN @ MH 3 O'CLOCK/ACTIVE

Properties (7)

additional_info
SC411299
custom_field_three
AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2020-06-23T01:06:17-07:00
documentation
PRO PIPE
is_lateral_inspection
false