Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 23, 2020, 09:13 AM
  • 14 0394_14 0393_06232020_022455.mp4

Date
06/23/2020
W/O
833715
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18475
Time
2:13 AM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7858
Sewer Name
TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_833715_TV14025_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0394
Downstream MH
14 0393
Dir. of Survey
Downstream
Length Surveyed
339.4 ft.
Total Length
339.4 ft.
Structural Index
3
Structural Quick
3Z2L
Structural Rating
536
O&M Index
2
O&M Quick
2Z00
O&M Rating
268
Overall Index
2
Overall Quick
Overall Rating
804
Pipe schematic from manhole 14 0394 to 14 0393
MH: 14 0394MH: 14 0393downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 03940 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 35% MAG COAT2 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start47 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - UNKNOWN71.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"96.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"124.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"148.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"172.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"196.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - UNKNOWN221 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"246 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"270.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"298.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"322.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"337 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish337 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish337.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish337.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish337.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish339.4 ft. MGO - General Observation - ROACHES @ MH339.4 ft. AMH - Downstream Manhole, Survey Ends - 14 0393

Observation photos (5)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    339.4 ft. - General Observation - ROACHES @ MH

Observations (29)

DistanceCodeObservation
0MGOROACHES @ MH
337.8SAP
337DAR
0MWL
2DAGS
298.6TFC
270.1TFC
2SSS
47TFUNKNOWN
246TFC
2MGO35% MAG COAT
196.1TFUNKNOWN
96.1TFC
337.8DAGS
339.4MGOROACHES @ MH
2DAR
2SAP
322.4TFC
148.3TFC
337CM
337.8SSS
124.3TFC
0AMH14 0394
172.5TFC
339.4AMH14 0393
0MWM
221TFC
71.6TFC
2CM

Properties (7)

additional_info
SC411299
custom_field_three
AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2020-06-23T02:13:54-07:00
documentation
PRO PIPE
is_lateral_inspection
false