Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 23, 2020, 09:36 AM
  • 14 0392A_14 0392_06232020_024251.mp4

Date
06/23/2020
W/O
833715
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18473
Time
2:36 AM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7858
Sewer Name
TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_833715_TV14025_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0392A
Downstream MH
14 0392
Dir. of Survey
Downstream
Length Surveyed
32.5 ft.
Total Length
32.5 ft.
Structural Index
3
Structural Quick
3626
Structural Rating
30
O&M Index
2
O&M Quick
2800
O&M Rating
16
Overall Index
2
Overall Quick
Overall Rating
46
Pipe schematic from manhole 14 0392A to 14 0392
MH: 14 0392AMH: 14 0392downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 14 0392A0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 35% MAG COAT2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start7.4 ft. TBC - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"11.5 ft. TBC - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"15.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"31.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish31.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish31.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish32.5 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE32.5 ft. AMH - Downstream Manhole, Survey Ends - 14 039232.5 ft. MGO - General Observation - ROACHES @ MH

Observation photos (5)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    32.5 ft. - General Observation - ROACHES @ MH

Observations (18)

DistanceCodeObservation
15.9TFC
0MGOROACHES @ MH
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
2DAGS
0AMH14 0392A
0MWL
32.5MGOCONN @ MH 9 O'CLOCK/ACTIVE
31.1SSS
2MGO35% MAG COAT
11.5TBC
0MWL
32.5AMH14 0392
7.4TBC
2SSS
2SAP
32.5MGOROACHES @ MH
31.1DAGS
31.1SAP

Properties (7)

additional_info
SC411299
custom_field_three
AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2020-06-23T02:36:59-07:00
documentation
PRO PIPE
is_lateral_inspection
false