Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 22, 2020, 09:38 AM
  • B 0369_B 0368_07222020_025310.mp4

Date
07/22/2020
W/O
839230
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00091
PipeID
P08881
Time
2:38 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7330
Sewer Name
JOINT OUTFALL B - UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
10
Purpose
Routine Assessment
Project
WO_839230_TV15051_JUL2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
63 in.
Upstream MH
B 0369
Downstream MH
B 0368
Dir. of Survey
Downstream
Length Surveyed
240.1 ft.
Total Length
240.1 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
235
O&M Index
2
O&M Quick
2H00
O&M Rating
94
Overall Index
2
Overall Quick
Overall Rating
329
Pipe schematic from manhole B 0369 to B 0368
MH: B 0369MH: B 0368downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O' CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - B 03690 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.6 ft. MGO - General Observation - 55% MAG COAT START236.8 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish237.1 ft. MGO - General Observation - 55% MAG COAT FINISH238 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish238 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish240 ft. MGO - General Observation - CONN @ MH 9 O' CLOCK/CAPPED240 ft. MGO - General Observation - CONN @ MH 3 O' CLOCK/CAPPED240.1 ft. MGO - General Observation - ROACHES @ MH240.1 ft. AMH - Downstream Manhole, Survey Ends - B 0368

Observation photos (1)

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
0MGOROACHES @ MH
238SSS
240MGOCONN @ MH 9 O' CLOCK/CAPPED
237.1MGO55% MAG COAT FINISH
2SSS
236.8SAV
0MWL
0MGOCONN @ MH 3 O' CLOCK/ACTIVE
240.1MGOROACHES @ MH
2.6MGO55% MAG COAT START
0AMHB 0369
240MGOCONN @ MH 3 O' CLOCK/CAPPED
240.1AMHB 0368
2DAGS
238DAGS
2SAV
0MWM

Properties (5)

additional_info
SC411325
custom_field_two
2
customer
1
datetime
2020-07-22T02:38:16-07:00
is_lateral_inspection
false