Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 28, 2020, 09:07 AM
  • B 0365_B 0364_07282020_021953.mp4

Date
07/28/2020
W/O
839230
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00091
PipeID
P08877
Time
2:07 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7886
Sewer Name
JOINT OUTFALL B - UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
10
Purpose
Routine Assessment
Project
WO_839230_TV15051_JUL2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
63 in.
Upstream MH
B 0365
Downstream MH
B 0364
Dir. of Survey
Downstream
Length Surveyed
291.2 ft.
Total Length
291.2 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
285
O&M Index
2
O&M Quick
412J
O&M Rating
118
Overall Index
2
Overall Quick
Overall Rating
403
Pipe schematic from manhole B 0365 to B 0364
MH: B 0365MH: B 0364downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Begins - B 03650 ft. MGO - General Observation - CONN @ MH 3 O' CLOCK/CAPPED0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 45% MAG COAT4.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start288.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish288.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish288.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish291 ft. MGO - General Observation - CONN @ MH 9 O' CLOCK/UNKNOWN291.2 ft. AMH - Downstream Manhole, Survey Ends - B 0364291.2 ft. MGO - General Observation - ROACHES @ MH

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    4.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
288.5DAGS
2DAGS
0MWL
0MGOROACHES @ MH
288.5SSS
291.2AMHB 0364
2SAP
291MGOCONN @ MH 9 O' CLOCK/UNKNOWN
291.2MGOROACHES @ MH
4.8SSS
0AMHB 0365
0MGOCONN @ MH 3 O' CLOCK/CAPPED
288.5SAP
2MGO45% MAG COAT
0MWM

Properties (7)

additional_info
SC411726
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-07-28T02:07:21-07:00
documentation
PRO PIPE
is_lateral_inspection
false