Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 30, 2020, 07:59 AM
  • B 0363_B 0362_07302020_011634.mp4

Date
07/30/2020
W/O
839230
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00091
PipeID
P08875
Time
12:59 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7892
Sewer Name
JOINT OUTFALL B - UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
10
Purpose
Routine Assessment
Project
WO_839230_TV15051_JUL2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
63 in.
Upstream MH
B 0363
Downstream MH
B 0362
Dir. of Survey
Downstream
Length Surveyed
459.3 ft.
Total Length
459.3 ft.
Structural Index
3
Structural Quick
3Q2Q
Structural Rating
455
O&M Index
2
O&M Quick
412Q
O&M Rating
186
Overall Index
2
Overall Quick
Overall Rating
641
Pipe schematic from manhole B 0363 to B 0362
MH: B 0363MH: B 0362downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 03630 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 70% MAG COAT456.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish456.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish456.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish459 ft. MGO - General Observation - CONN @ MH 9 O' CLOCK/CAPPED459.3 ft. AMH - Downstream Manhole, Survey Ends - B 0362459.3 ft. MGO - General Observation - ROACHES @ MH

Observation photos (4)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    459.3 ft. - General Observation - ROACHES @ MH

Observations (13)

DistanceCodeObservation
0MWM
2SAP
0AMHB 0363
0MWL
2SSS
2DAGS
456.9SSS
459.3AMHB 0362
459MGOCONN @ MH 9 O' CLOCK/CAPPED
459.3MGOROACHES @ MH
456.9SAP
2MGO70% MAG COAT
456.9DAGS

Properties (6)

additional_info
SC411732
custom_field_two
2
customer
1
datetime
2020-07-30T00:59:47-07:00
documentation
PRO PIPE
is_lateral_inspection
false