Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 30, 2020, 08:17 AM
  • B 0362_B 0361_07302020_012943.mp4

Date
07/30/2020
W/O
839230
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00091
PipeID
P08874
Time
1:17 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7892
Sewer Name
JOINT OUTFALL B - UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
10
Purpose
Routine Assessment
Project
WO_839230_TV15051_JUL2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
63 in.
Upstream MH
B 0362
Downstream MH
B 0361
Dir. of Survey
Downstream
Length Surveyed
258.2 ft.
Total Length
258.2 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
250
O&M Index
2
O&M Quick
412I
O&M Rating
106
Overall Index
2
Overall Quick
Overall Rating
356
Pipe schematic from manhole B 0362 to B 0361
MH: B 0362MH: B 0361downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 03622 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 70% MAG COAT8.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start8.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start256.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish256.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish256.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish258.2 ft. AMH - Downstream Manhole, Survey Ends - B 0361258.2 ft. MGO - General Observation - ROACHES @ MH

Observation photos (5)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    8.5 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    8.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    258.2 ft. - General Observation - ROACHES @ MH

Observations (13)

DistanceCodeObservation
256.8DAGS
2DAGS
0MGOROACHES @ MH
258.2AMHB 0361
0MWM
2MGO70% MAG COAT
0MWL
8.5SAP
256.8SSS
8.5SSS
0AMHB 0362
256.8SAP
258.2MGOROACHES @ MH

Properties (7)

additional_info
SC411732
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-07-30T01:17:24-07:00
documentation
PRO PIPE
is_lateral_inspection
false