Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 23, 2020, 05:17 AM
  • 15 0724_15 0723_06222020_222855.mp4

Date
06/22/2020
W/O
833716
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00616
PipeID
P12617
Time
10:17 PM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7804
Sewer Name
15 MONROVIA OUTFALL TRUNK
City
MONROVIA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
09
Purpose
Routine Assessment
Project
WO_833716_TV15131_JUN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
15 0724
Downstream MH
15 0723
Dir. of Survey
Downstream
Length Surveyed
165.2 ft.
Total Length
165.2 ft.
Structural Index
3
Structural Quick
3E00
Structural Rating
96
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
96
Pipe schematic from manhole 15 0724 to 15 0723
MH: 15 0724MH: 15 0723downstream0 ft. MGO - General Observation - ACTIVE CONNECTION IN MH, 9 O' CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 15 07242 ft. MGO - General Observation - COCKROACHES THROUGHOUT LINE2.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.8 ft. MGO - General Observation - MAG COATING ATTATCHED70 ft. MGO - General Observation - Spalling 70 to 73' @ 9 O'CLK. within 8"135 ft. MGO - General Observation - Spalling @ 135 to 138' @ 9 O'clock - within 8"164.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish165.2 ft. AMH - Downstream Manhole, Survey Ends - 15 0723165.2 ft. MGO - General Observation - CONNECTION IN MH, 3 O' CLOCK

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
165.2AMH15 0723
0MGOACTIVE CONNECTION IN MH, 9 O' CLOCK
0AMH15 0724
70MGOSpalling 70 to 73' @ 9 O'CLK. within 8"
2.5SAP
165.2MGOCONNECTION IN MH, 3 O' CLOCK
164.2SAP
2MGOCOCKROACHES THROUGHOUT LINE
6.8MGOMAG COATING ATTATCHED
135MGOSpalling @ 135 to 138' @ 9 O'clock - within 8"

Properties (7)

additional_info
SC411614
custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2020-06-22T22:17:33-07:00
documentation
PROPIPE
is_lateral_inspection
false