Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 21, 2020, 09:03 AM
  • F 0201_F 0200_8212020_020813.mp4

Date
08/21/2020
W/O
0838782
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00048
PipeID
P10331
Time
2:03 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1543
Sewer Name
F JOINT OUTFALL F - UNIT 7F
City
CERRITOS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
38
Purpose
Capital Improvement Program Assesment
Project
20200818MDM_JOINT_OUTFALL_UNIT_7F
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Upstream MH
F 0201
Downstream MH
F 0200
Dir. of Survey
Downstream
Length Surveyed
500.9 ft.
Total Length
500.9 ft.
Structural Index
2
Structural Quick
2300
Structural Rating
6
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
10
Pipe schematic from manhole F 0201 to F 0200
MH: F 0201MH: F 0200downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:10AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT2 ft. MGO - General Observation - MAG COAT 70% START11.8 ft. MGO - General Observation - GREASE COAT ON MAG COAT FROM HOT SEWAGE50.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Active50.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 04 o'clock, , within 8 inches of joint: NO54.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 08 o'clock, , within 8 inches of joint: NO63.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE195.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped217.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE UNDER MAG COAT277.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped457.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped500.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE UNDER MAG GREASE COAT500.6 ft. MGO - General Observation - GREASE COAT ON MAG COAT FINISH500.6 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active500.6 ft. MGO - General Observation - MAG COAT 70% FINISH500.9 ft. AMH - Downstream Manhole, Survey Ends - 2:40AM

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

  • General Observation - MAG COAT 70% START

    2 ft. - General Observation - MAG COAT 70% START

  • General Observation - GREASE COAT ON MAG COAT FROM HOT SEWAGE

    11.8 ft. - General Observation - GREASE COAT ON MAG COAT FROM HOT SEWAGE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

    63.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE UNDER MAG COAT

    217.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE UNDER MAG COAT

Observations (19)

DistanceCodeObservation
195.4TFCCapped
277.9TFCCapped
11.8MGOGREASE COAT ON MAG COAT FROM HOT SEWAGE
217.7SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
50.3TFActive
0AMH2:10AM
63.3SSSBLISTERING PEELING CONCRETE
0MWL
500.6SSSBLISTERING PEELING CONCRETE UNDER MAG GREASE COAT
500.6MGOGREASE COAT ON MAG COAT FINISH
0MWM
500.6MGOConn. @ Mh, 3 O' Clock. Active
54.9DAGS
500.6MGOMAG COAT 70% FINISH
50.3DAGS
457.6TFCCapped
500.9AMH2:40AM
2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
2MGOMAG COAT 70% START

Properties (6)

custom_field_three
BLISTERING PEELING CONCRETE
custom_field_two
3
customer
LACSD
datetime
2020-08-21T02:03:56-07:00
documentation
MARTIN,OLIVER 111,BARR,CASTILLO
is_lateral_inspection
false