F 0209_F 0208_8202020_041916.mp4
2 ft. - General Observation - MAG COAT 70% START
2 ft. - General Observation - GREASE COAT ON MAG COAT FROM HOT SEWAGE
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
28.1 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 02 to 04 o'clock, , within 8 inches of joint: NO
75.9 ft. - General Observation - GREASE COAT ON MAG COAT
206.6 ft. - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Open-100% MINERIAL DEPOSIYE
206.6 ft. - Deposits Attached Encrustation, 20 %of cross sectional area, from 01 to 05 o'clock, , within 8 inches of joint: NO
361 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: NO
397.9 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 01 to 05 o'clock, , within 8 inches of joint: NO
397.9 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped
488.4 ft. - Deposits Attached Encrustation, 20 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 361 | TF | Active |
| 500.7 | AMH | 5:00AM |
| 500.2 | MGO | GREASE COAT ON MAG COAT FINISH |
| 500.2 | MGO | 70% MAG COAT FINISH |
| 397.9 | DAE | — |
| 73.4 | MWL | — |
| 313.9 | TFC | Capped |
| 2 | MGO | MAG COAT 70% START |
| 75.9 | MGO | GREASE COAT ON MAG COAT |
| 28.1 | DAE | — |
| 28.1 | TFC | Capped |
| 361 | DAE | — |
| 397.9 | TFC | Capped |
| 206.6 | TFD | Open-100% MINERIAL DEPOSIYE |
| 0 | AMH | 4:15AM |
| 0 | MWM | — |
| 2 | MGO | GREASE COAT ON MAG COAT FROM HOT SEWAGE |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 119.7 | TFC | Capped |
| 313.9 | TFC | Capped |
| 206.6 | DAE | — |
| 119.7 | DAE | — |
| 0 | MWL | — |
| 500.2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 488.4 | DAE | — |