F 0210_F 0209_8202020_030154.mp4
2 ft. - General Observation - MAG COAT 70% START
2 ft. - General Observation - GREASE COAT ON MAG COAT FROM HOT SEWAGE
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
156.7 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 02 to 05 o'clock, , within 8 inches of joint: NO
156.7 ft. - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Open-90% MINERIAL DEPOSITES
207.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
344.2 ft. - General Observation - MAG COAT GREASE COAT
438.1 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES
497.4 ft. - Infiltration Dripper, from 10 to 02 o'clock, within 8 inches of joint: NO - AT MH
497.4 ft. - Deposits Attached Encrustation, 15 %of cross sectional area, from 08 to 12 o'clock, , within 8 inches of joint: NO - AT MH
| Distance | Code | Observation |
|---|---|---|
| 323.7 | TFC | Capped |
| 216.4 | TF | Open |
| 189.2 | DAGS | — |
| 497.4 | ID | AT MH |
| 438.1 | DAE | — |
| 2 | MGO | MAG COAT 70% START |
| 500.9 | AMH | 3:55AM |
| 344.2 | MGO | MAG COAT GREASE COAT |
| 156.7 | DAE | — |
| 2 | MGO | GREASE COAT ON MAG COAT FROM HOT SEWAGE |
| 73.6 | TFC | Capped |
| 500.1 | MGO | MAG COAT 70% FINISH |
| 207.5 | SSS | BLISTERING CONCRETE |
| 405.9 | TFC | Capped |
| 0 | AMH | 3:15AM |
| 500.1 | SSS | BLISTERING PEELING CONCRETE UNDER MAG GREASE COAT |
| 497.4 | DAE | AT MH |
| 0 | MWM | — |
| 185.5 | TF | Active |
| 156.7 | TFD | Open-90% MINERIAL DEPOSITES |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 0 | MWL | — |