Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 20, 2020, 08:18 AM
  • F 0204_F 0203_8202020_012240.mp4

Date
08/20/2020
W/O
0838782
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00048
PipeID
P10334
Time
1:18 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1541
Sewer Name
F JOINT OUTFALL F - UNIT 7F
City
CERRITOS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
38
Purpose
Capital Improvement Program Assesment
Project
20200818MDM_JOINT_OUTFALL_UNIT_7F
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Upstream MH
F 0204
Downstream MH
F 0203
Dir. of Survey
Downstream
Length Surveyed
38.9 ft.
Total Length
38.9 ft.
Structural Index
2
Structural Quick
2200
Structural Rating
4
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole F 0204 to F 0203
MH: F 0204MH: F 0203downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:25AM2 ft. MGO - General Observation - GREASE COAT ON MAG COAT FROM HOT SEWAGE2 ft. MGO - General Observation - MAG COAT 70% START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT8.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE23.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped38.4 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active38.4 ft. MGO - General Observation - 70% MAG COAT FINISH38.4 ft. MGO - General Observation - GREASE COAT ON MAG COAT FINISH38.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE UNDER MAG COAT38.9 ft. AMH - Downstream Manhole, Survey Ends - 1:35AM

Observation photos (4)

  • General Observation - GREASE COAT ON MAG COAT FROM HOT SEWAGE

    2 ft. - General Observation - GREASE COAT ON MAG COAT FROM HOT SEWAGE

  • General Observation - MAG COAT 70% START

    2 ft. - General Observation - MAG COAT 70% START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

    8.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

Observations (13)

DistanceCodeObservation
2MGOGREASE COAT ON MAG COAT FROM HOT SEWAGE
38.4MGOConn. @ Mh, 3 O' Clock. Active
2MGOMAG COAT 70% START
23.4TFCCapped
38.4MGO70% MAG COAT FINISH
38.9AMH1:35AM
38.4MGOGREASE COAT ON MAG COAT FINISH
0MWL
0MWM
0AMH1:25AM
2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
8.4SSSBLISTERING PEELING CONCRETE
38.4SSSBLISTERING PEELING CONCRETE UNDER MAG COAT

Properties (6)

custom_field_three
BLISTERING PEELING CONCRETE
custom_field_two
3
customer
LACSD
datetime
2020-08-20T01:18:38-07:00
documentation
MARTIN,OLIVER 111,BARR,CASTILLO
is_lateral_inspection
false