F 0212_F 0211A_8182020_032933.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHTLY BLISTERING PEELING CONCRETE WITH GREASE COAT
2 ft. - General Observation - PIPE HAS SMOOTH SUFACE WITH GREASE COAT
3 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 05 o'clock, , within 8 inches of joint: NO
13.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 05 o'clock, , within 8 inches of joint: YES, Start
47.3 ft. - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - THIN GREASE COAT ON PIPE
232.4 ft. - General Observation - PIPE
| Distance | Code | Observation |
|---|---|---|
| 410.4 | DAZ | THIN GREASE COAT |
| 278.6 | TFC | Open |
| 13.7 | DAGS | — |
| 3 | DAGS | — |
| 91.7 | TF | Open |
| 40.7 | DAGS | — |
| 410.7 | AMH | 3:55AM |
| 358.7 | TF | Active |
| 2 | SSS | SLIGHTLY BLISTERING PEELING CONCRETE WITH GREASE COAT |
| 196.7 | TFC | Open |
| 0 | MGO | MH CONN ACTIVE 3:00 |
| 410.4 | MGO | MH CONN 9:00 ACTIVE |
| 410.4 | SSS | SLIGHTLY BLISTERING PEELING CNCRETE WITH GREASE COAT |
| 47.3 | DAZ | THIN GREASE COAT ON PIPE |
| 0 | AMH | 3:25AM |
| 2 | MGO | PIPE HAS SMOOTH SUFACE WITH GREASE COAT |
| 0 | MWM | — |
| 410.4 | MGO | MH CONN 9:30 OPEN |
| 0 | MWL | — |
| 114.6 | TF | Open |
| 358.7 | DAE | AT CONN |
| 232.4 | MGO | PIPE |