Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 16, 2020, 03:53 AM
  • F 0080_F 0079_06152020_224300.mp4

Date
06/15/2020
W/O
833709
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00043
PipeID
P10284
Time
8:53 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7731
Sewer Name
JOINT OUTFALL F - UNIT 7A
City
CERRITOS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
37
Purpose
Routine Assessment
Project
RFIR_WO_833709_TV02203_JUN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
60 in.
Width
33 in.
Upstream MH
F 0080
Downstream MH
F 0079
Dir. of Survey
Downstream
Length Surveyed
699 ft.
Total Length
699 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole F 0080 to F 0079
MH: F 0080MH: F 0079downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 00802.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start158.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"699 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish699 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish699 ft. AMH - Downstream Manhole, Survey Ends - F 0079 ZOOMED IN699 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
699SSS
2.1SRV
0MWM
158.6TFA
0MWL
699SAP
0AMHF 0080
2.1SSS
699AMHF 0079 ZOOMED IN
699SRV
2.1SAP

Properties (7)

additional_info
SC411389
custom_field_three
SURFACE REINFORCEMENT VISIBLE, AGG., SPALL..
custom_field_two
2
customer
1
datetime
2020-06-15T20:53:11-07:00
documentation
PROPIPE
is_lateral_inspection
false