Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 16, 2020, 08:05 AM
  • H 0136_H 0135_06162020_011858.mp4

Date
06/16/2020
W/O
833497
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00166
PipeID
P10588
Time
1:05 AM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7697
Sewer Name
JOINT OUTFALL H - UNIT 1G
City
HUNTINGTON PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
04
Purpose
Routine Assessment
Project
WO_833497_TV01098_JUN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
H 0136
Downstream MH
H 0135
Dir. of Survey
Downstream
Length Surveyed
443.3 ft.
Total Length
443.3 ft.
Structural Index
3
Structural Quick
5G3Q
Structural Rating
635
O&M Index
2
O&M Quick
2Q00
O&M Rating
176
Overall Index
3
Overall Quick
Overall Rating
811
Pipe schematic from manhole H 0136 to H 0135
MH: H 0136MH: H 0135downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 01362 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start441.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish441.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish441.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish443.3 ft. AMH - Downstream Manhole, Survey Ends - H 0135443.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    443.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (13)

DistanceCodeObservation
0MGOCONNECTION AT MH 9 O'CLOCK
0MWM
441.8SSS
0MGOCOCKROACHES IN MANHOLE
443.3AMHH 0135
0MWL
0AMHH 0136
2SSS
2SAP
441.8DAGS
443.3MGOCOCKROACHES IN MANHOLE
441.8SAP
2DAGS

Properties (7)

additional_info
SC411289
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2020-06-16T01:05:47-07:00
documentation
PRO PIPE
is_lateral_inspection
false