Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 17, 2020, 05:22 AM
  • H 0128_H 0127_06162020_222958.mp4

Date
06/16/2020
W/O
833497
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00166
PipeID
P10580
Time
10:22 PM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7698
Sewer Name
JOINT OUTFALL H - UNIT 1G
City
HUNTINGTON PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
04
Purpose
Routine Assessment
Project
WO_833497_TV01098_JUN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
H 0128
Downstream MH
H 0127
Dir. of Survey
Downstream
Length Surveyed
89.3 ft.
Total Length
89.3 ft.
Structural Index
3
Structural Quick
3B2B
Structural Rating
85
O&M Index
2
O&M Quick
2B00
O&M Rating
34
Overall Index
2
Overall Quick
Overall Rating
119
Pipe schematic from manhole H 0128 to H 0127
MH: H 0128MH: H 0127downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 01282 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start88.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish88.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish88.9 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK88.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish89.3 ft. AMH - Downstream Manhole, Survey Ends - H 012789.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    89.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (13)

DistanceCodeObservation
89.3AMHH 0127
89.3MGOCOCKROACHES IN MANHOLE
2SSS
88.9SAP
88.9SSS
88.9MGOCONNECTION AT MH 9 O'CLOCK
0MGOCOCKROACHES IN MANHOLE
88.9DAGS
0MWM
0MWL
2SAP
2DAGS
0AMHH 0128

Properties (6)

additional_info
SC411290
custom_field_two
3
customer
1
datetime
2020-06-16T22:22:42-07:00
documentation
PRO PIPE
is_lateral_inspection
false