Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 22, 2020, 04:43 AM
  • H 0353A_H 0353 _07212020_220428.mp4

Date
07/21/2020
W/O
838974
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00176
PipeID
P10803
Time
9:43 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7926
Sewer Name
JOINT OUTFALL H - UNIT 4 RELIEF
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
19A
Purpose
Routine Assessment
Project
RFIR_WO_838974_TV02375_JUL2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
63 in.
Width
63 in.
Upstream MH
H 0353A
Downstream MH
H 0353
Dir. of Survey
Downstream
Length Surveyed
419.6 ft.
Total Length
419.6 ft.
Structural Index
4
Structural Quick
5131
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
8
Pipe schematic from manhole H 0353A to H 0353
MH: H 0353AMH: H 0353downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 0353A0 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.4 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start51 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE112.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - ACTIVE146.8 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish147 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - ACTIVE419.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish419.6 ft. AMH - Downstream Manhole, Survey Ends - h 0353 zoomed in

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    7.4 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
7.4SRV
147TFACTIVE
0MWM
0MWL
51TFACTIVE
419.3SAP
112.2TFACTIVE
2.1SAP
419.6AMHh 0353 zoomed in
0AMHH 0353A
0MGOCONNECTION AT MH 3 OCLOCK
146.8SRV

Properties (7)

additional_info
SC411785
custom_field_three
aggregate projecting/reinforcement visible
custom_field_two
2
customer
1
datetime
2020-07-21T21:43:13-07:00
documentation
PROPIPE
is_lateral_inspection
false