Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 30, 2020, 09:16 AM
  • 22 1064_22 1063_06302020_022542.mp4

Date
06/30/2020
W/O
839181
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00812
PipeID
P17435
Time
2:16 AM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7860
Sewer Name
IRWINDALE TRUNK, SECTS 2,3,4,&5
City
IRWINDALE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_839181_TV22043_JUL2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 1064
Downstream MH
22 1063
Dir. of Survey
Downstream
Length Surveyed
289.2 ft.
Total Length
289.2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 22 1064 to 22 1063
MH: 22 1064MH: 22 1063downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 OCLOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - ROACHES IN MH0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 10642 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start136.2 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"189.1 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"286.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish286.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish286.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish289.2 ft. AMH - Downstream Manhole, Survey Ends - 22 1063289.2 ft. MGO - General Observation - CONNECTION AT MH 9 OCLOCK289.2 ft. MGO - General Observation - ROACHES IN MH

Observation photos (5)

  • General Observation - ROACHES IN MH

    0 ft. - General Observation - ROACHES IN MH

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - ROACHES IN MH

    289.2 ft. - General Observation - ROACHES IN MH

Observations (16)

DistanceCodeObservation
286.8SAP
189.1TBA
289.2AMH22 1063
0MGOCONNECTION AT MH 9 OCLOCK
2SAP
289.2MGOCONNECTION AT MH 9 OCLOCK
0MWL
289.2MGOROACHES IN MH
286.8SSS
286.8DAGS
2SSS
0MGOROACHES IN MH
0MWM
0AMH22 1064
136.2TB
2DAGS

Properties (7)

additional_info
SC411698
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-06-30T02:16:22-07:00
documentation
PRO PIPE
is_lateral_inspection
false