Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 30, 2020, 10:27 AM
  • 22 1061_22 1060_06302020_033938.mp4

Date
06/30/2020
W/O
839181
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00812
PipeID
P17432
Time
3:27 AM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7860
Sewer Name
IRWINDALE TRUNK, SECTS 2,3,4,&5
City
IRWINDALE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
24
Purpose
Routine Assessment
Project
RFIR_WO_839181_TV22043_JUL2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 1061
Downstream MH
22 1060
Dir. of Survey
Downstream
Length Surveyed
285.7 ft.
Total Length
285.7 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
11
Pipe schematic from manhole 22 1061 to 22 1060
MH: 22 1061MH: 22 1060downstream0 ft. MGO - General Observation - ROACHES IN MH0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 70 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 10612 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start26.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start27.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"75.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"123.6 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"176.2 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"224.5 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"282.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish282.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Finish282.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish285.7 ft. AMH - Downstream Manhole, Survey Ends - 22 1060285.7 ft. MGO - General Observation - ROACHES IN MH285.7 ft. MGO - General Observation - CONNECTION AT MH 9 OCLOCK

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    26.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES IN MH

    285.7 ft. - General Observation - ROACHES IN MH

Observations (18)

DistanceCodeObservation
75.8TF
0MGOROACHES IN MH
285.7AMH22 1060
2DAGS
26.2SSS
282.9SAP
224.5TF
285.7MGOROACHES IN MH
0MWL
123.6TFC
282.9DAGS
282.9SSS
0MWM
27.4TF
176.2TFA
0AMH22 1061
2SAP
285.7MGOCONNECTION AT MH 9 OCLOCK

Properties (7)

additional_info
SC411698
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-06-30T03:27:26-07:00
documentation
PRO PIPE
is_lateral_inspection
false