Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 18, 2020, 05:51 AM
  • 15 0671_15 0670_06172020_230620.mp4

Date
06/17/2020
W/O
833764
Weather
Dry
Operator/Surveyor
EN. RUIZ
Sewer ID
Z00602
PipeID
P12563
Time
10:51 PM
Certificate
U-116-07001919
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7766
Sewer Name
EL MONTE AVENUE TRUNK
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
WO_833764_TV15005_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
15 0671
Downstream MH
15 0670
Dir. of Survey
Downstream
Length Surveyed
179.8 ft.
Total Length
179.8 ft.
Structural Index
3
Structural Quick
423F
Structural Rating
183
O&M Index
2
O&M Quick
2F00
O&M Rating
70
Overall Index
2
Overall Quick
Overall Rating
253
Pipe schematic from manhole 15 0671 to 15 0670
MH: 15 0671MH: 15 0670downstream0 ft. MGO - General Observation - COCKROACHES IN MH0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 06712.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start2.1 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start2.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Start12.8 ft. FM - Fracture Multiple, from 07 to 11 o'clock, within 8 inches of joint: YES30.8 ft. FM - Fracture Multiple, from 12 to 04 o'clock, within 8 inches of joint: YES41 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"93.3 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 4"101.1 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"137.7 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"156.1 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"168 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 8"177.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Finish177.5 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish177.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish179.8 ft. AMH - Downstream Manhole, Survey Ends - 15 0670179.8 ft. MGO - General Observation - COCKROACHES IN MH179.8 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK

Observation photos (15)

  • General Observation - COCKROACHES IN MH

    0 ft. - General Observation - COCKROACHES IN MH

  • General Observation - CONNECTION AT MH, 3 O'CLOCK

    0 ft. - General Observation - CONNECTION AT MH, 3 O'CLOCK

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: NO, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

    2.1 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

    2.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

  • Fracture Multiple, from 07 to 11 o'clock, within 8 inches of joint: YES

    12.8 ft. - Fracture Multiple, from 07 to 11 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 12 to 04 o'clock, within 8 inches of joint: YES

    30.8 ft. - Fracture Multiple, from 12 to 04 o'clock, within 8 inches of joint: YES

  • Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"

    41 ft. - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"

  • Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 4"

    93.3 ft. - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 4"

  • Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"

    101.1 ft. - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"

  • Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"

    137.7 ft. - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"

  • Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"

    156.1 ft. - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"

  • Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 8"

    168 ft. - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 8"

  • General Observation - COCKROACHES IN MH

    179.8 ft. - General Observation - COCKROACHES IN MH

  • General Observation - CONNECTION AT MH, 3 O'CLOCK

    179.8 ft. - General Observation - CONNECTION AT MH, 3 O'CLOCK

Observations (22)

DistanceCodeObservation
41TFC
0MGOCOCKROACHES IN MH
168TFC
2.1DAGS
30.8FM
2.1SAV
12.8FM
179.8AMH15 0670
179.8MGOCOCKROACHES IN MH
0MWL
177.5DAGS
0MGOCONNECTION AT MH, 3 O'CLOCK
156.1TFC
179.8MGOCONNECTION AT MH, 3 O'CLOCK
177.5SAV
0MWM
137.7TFC
0AMH15 0671
101.1TFC
177.5SSS
2.1SSS
93.3TF

Properties (7)

additional_info
SC411478
custom_field_three
AGGREGATE, SPALLING, GREASE, FRACTURES
custom_field_two
3
customer
1
datetime
2020-06-17T22:51:41-07:00
documentation
PRO PIPE
is_lateral_inspection
false