Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 18, 2020, 06:08 AM
  • 01 0266_01 0265_06182020_000358.mp4

Date
06/17/2020
W/O
833688
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00218
PipeID
P01312
Time
11:08 PM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7851
Sewer Name
SOUTH PARK AVENUE TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_833688_TV01204_JUN2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
18 in.
Upstream MH
01 0266
Downstream MH
01 0265
Dir. of Survey
Downstream
Length Surveyed
333 ft.
Total Length
333 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2L00
O&M Rating
132
Overall Index
2
Overall Quick
Overall Rating
132
Pipe schematic from manhole 01 0266 to 01 0265
MH: 01 0266MH: 01 0265downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 02662.1 ft. MLC - Lining Change, Cured in place2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start110.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"138 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"206.8 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"267.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"332 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish333 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK333 ft. AMH - Downstream Manhole, Survey Ends - 01 0265333 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Lining Change, Cured in place

    2.1 ft. - Lining Change, Cured in place

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    333 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (15)

DistanceCodeObservation
333MGOCONNECTION AT MH 3 O'CLOCK
0MWM
138TFA
206.8TB
2.1MLC
110.9TFA
267.8TFA
2.1DAGS
332DAGS
333AMH01 0265
0MGOCOCKROACHES IN MANHOLE
0MGOCONNECTION AT MH 3 O'CLOCK
0MWL
0AMH01 0266
333MGOCOCKROACHES IN MANHOLE

Properties (7)

additional_info
SC411292
custom_field_three
RFIR/LIGHT GREASE/LINED WITH CIPP
custom_field_two
3
customer
1
datetime
2020-06-17T23:08:03-07:00
documentation
PRO PIPE
is_lateral_inspection
false