Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 17, 2020, 08:21 AM
  • 01 0261_01 0260_06172020_014336.mp4

Date
06/17/2020
W/O
833688
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00218
PipeID
P01307
Time
1:21 AM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7699
Sewer Name
SOUTH PARK AVENUE TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_833688_TV01204_JUN2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
18 in.
Upstream MH
01 0261
Downstream MH
01 0260
Dir. of Survey
Downstream
Length Surveyed
325.9 ft.
Total Length
325.9 ft.
Structural Index
4
Structural Quick
4L00
Structural Rating
252
O&M Index
3
O&M Quick
4122
O&M Rating
8
Overall Index
4
Overall Quick
Overall Rating
260
Pipe schematic from manhole 01 0261 to 01 0260
MH: 01 0261MH: 01 0260downstream0 ft. MGO - General Observation - CONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 65 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 02610 ft. MWL - Water Level, 35 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start7.6 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start64.3 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"104.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"143.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"185.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"225.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"324.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE324.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Finish324.3 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish325.9 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK325.9 ft. AMH - Downstream Manhole, Survey Ends - 01 0260

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    7.6 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    324.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (17)

DistanceCodeObservation
143.3TFA
0MGOCONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK
0MGOCOCKROACHES IN MANHOLE
225.7TFA
185.8TF
7.6FM
0MWM
325.9MGOCONNECTION AT MH 3 O'CLOCK
0AMH01 0261
325.9AMH01 0260
2DAGS
324.3MGOCOCKROACHES IN MANHOLE
104.4TFC
0MWL
324.3DAGS
324.3FM
64.3TBA

Properties (7)

additional_info
SC411291
custom_field_three
MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2020-06-17T01:21:17-07:00
documentation
PRO PIPE
is_lateral_inspection
false