Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 10, 2020, 09:16 AM
  • 01 0250_01 0249_06102020_024145.mp4

Date
06/10/2020
W/O
833688
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00218
PipeID
P01295
Time
2:16 AM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7691
Sewer Name
SOUTH PARK AVENUE TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_833688_TV01204_JUN2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
10 in.
Upstream MH
01 0250
Downstream MH
01 0249
Dir. of Survey
Downstream
Length Surveyed
349.6 ft.
Total Length
349.6 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
207
O&M Index
2
O&M Quick
2M00
O&M Rating
138
Overall Index
3
Overall Quick
Overall Rating
345
Pipe schematic from manhole 01 0250 to 01 0249
MH: 01 0250MH: 01 0249downstream0 ft. MGO - General Observation - CONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 01 02500 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start4.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start68.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"94.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"121.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"145.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"172.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"195.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"222.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"246 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"271.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"298.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"322.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"345.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"347.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish347.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish349.6 ft. AMH - Downstream Manhole, Survey Ends - 01 0249

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
298.6TFC
246TF
347.7DAGS
349.6AMH01 0249
347.7CM
172.5TFC
271.2TFC
2DAGS
322.8TFC
0MGOCONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK
0AMH01 0250
0MWM
222.6TFC
68.4TFC
94.6TF
195.9TFC
121.1TFC
4.7CM
0MWL
345.9TFC
145.4TFC

Properties (7)

additional_info
SC411283
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-06-10T02:16:15-07:00
documentation
PRO PIPE
is_lateral_inspection
false