Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 27, 2020, 10:16 AM
  • G 0130_G 0129_07272020_032412.mp4

Date
07/27/2020
W/O
838806
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01180
PipeID
P25035
Time
3:16 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7928
Sewer Name
JOINT OUTFALL G - UNIT 8
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
19
Purpose
Routine Assessment
Project
WO_838806_TV01004_JUL2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
G 0130
Downstream MH
G 0129
Dir. of Survey
Downstream
Length Surveyed
129.1 ft.
Total Length
129.1 ft.
Structural Index
2
Structural Quick
2D00
Structural Rating
50
O&M Index
2
O&M Quick
2D00
O&M Rating
50
Overall Index
2
Overall Quick
Overall Rating
100
Pipe schematic from manhole G 0130 to G 0129
MH: G 0130MH: G 0129downstream0 ft. AMH - Upstream Manhole, Survey Begins - G 01300 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start127 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish127 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish129.1 ft. AMH - Downstream Manhole, Survey Ends - G 0129129.1 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE

Observations (10)

DistanceCodeObservation
0AMHG 0130
2SSS
127DAGS
129.1AMHG 0129
127SSS
129.1MGOCONN @ MH 3 O'CLOCK/ACTIVE
0MWL
2.6DAGS
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
0MWM

Properties (8)

additional_info
SC411788
custom_field_three
NO SEVERE DEFECTS
custom_field_two
3
customer
1
datetime
2020-07-27T03:16:04-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
38026