Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 23, 2020, 05:15 AM
  • 02 1033_02 1032_06222020_223230.mp4

Date
06/22/2020
W/O
833765
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00280
PipeID
P03607
Time
10:15 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7738
Sewer Name
MONTEBELLO CITY TRUNK
City
MONTEBELLO
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
14
Purpose
Routine Assessment
Project
WO_833765_TV02295_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
24 in.
Upstream MH
02 1033
Downstream MH
02 1032
Dir. of Survey
Downstream
Length Surveyed
328 ft.
Total Length
328 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole 02 1033 to 02 1032
MH: 02 1033MH: 02 1032downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 10330 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 15 %of cross sectional area3.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start21.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start51.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"78.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"80.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"101.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"119.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"121.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"178.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"180.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"214.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"218.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"247.3 ft. OBP - Obstacles External Pipe or Cable, 15 %of cross sectional area, from 10 to 02 o'clock262.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"265.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"299.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"323.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"328 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish328 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK328 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish328 ft. AMH - Downstream Manhole, Survey Ends - 02 1032

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    21.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Obstacles External Pipe or Cable, 15 %of cross sectional area, from 10 to 02 o'clock

    247.3 ft. - Obstacles External Pipe or Cable, 15 %of cross sectional area, from 10 to 02 o'clock

Observations (26)

DistanceCodeObservation
178.7TFC
323.7TFC
121.9TFC
328SSS
262.9TFC
51.5TFC
328MGOCONNECTION AT MH 9 O'CLOCK
180.6TFC
328SAP
0MGOCONNECTION AT MH 9 O'CLOCK
247.3OBP
218.1TFC
299.9TFC
328AMH02 1032
214.4TFC
101.7TFC
265.9TFC
3.2SAP
78.3TFC
0MWM
0AMH02 1033
21.2SSS
80.7TFC
0MGOCONNECTION AT MH 3 O'CLOCK
119.1TFC
0MWL

Properties (7)

additional_info
SC411397
custom_field_three
SURFACE AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2020-06-22T22:15:57-07:00
documentation
PROPIPE
is_lateral_inspection
false