Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 2, 2020, 07:49 AM
  • B 0448_B 0447_06022020_010251.mp4

Date
06/02/2020
W/O
834129
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00093
PipeID
P08960
Time
12:49 AM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7681
Sewer Name
JOINT OUTFALL B - UNIT 5C
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_834129_TV16034_JUN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
63 in.
Upstream MH
B 0448
Downstream MH
B 0447
Dir. of Survey
Downstream
Length Surveyed
303.6 ft.
Total Length
303.6 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
300
O&M Index
2
O&M Quick
412K
O&M Rating
126
Overall Index
2
Overall Quick
Overall Rating
426
Pipe schematic from manhole B 0448 to B 0447
MH: B 0448MH: B 0447downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 04480 ft. MGO - General Observation - ROACHES @ MANHOLE0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 70% MAG COAT14.9 ft. TFD - Tap Factory Made Defective, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6" - 80% ROOTS-LATERAL/ACTIVE76.7 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"198.8 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"257.5 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"301 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish301.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish301.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish303 ft. MGO - General Observation - CONN @ MH 9 O' CLOCK/CAPPED303 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED303.6 ft. AMH - Downstream Manhole, Survey Ends - B 0447

Observation photos (4)

  • General Observation - ROACHES @ MANHOLE

    0 ft. - General Observation - ROACHES @ MANHOLE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - 70% MAG COAT

    2 ft. - General Observation - 70% MAG COAT

Observations (18)

DistanceCodeObservation
2SAP
14.9TFD80% ROOTS-LATERAL/ACTIVE
2DAGS
0MWM
198.8TFA
303MGOCONN @ MH 9 O' CLOCK/CAPPED
301.9SAP
257.5TFA
303MGOCONN @ MH 3 O'CLOCK/CAPPED
303.6AMHB 0447
2SSS
76.7TFA
301SSS
0AMHB 0448
301.9DAGS
0MGOROACHES @ MANHOLE
0MWL
2MGO70% MAG COAT

Properties (7)

additional_info
SC411273
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2020-06-02T00:49:16-07:00
documentation
PRO PIPE
is_lateral_inspection
false